Energy law


EVs in Belgium : Current situation

EVs in Belgium : Current situation
11/06/2010

Currently, there is a lot to do about EVs. The broad outlines of the technologies are already fixed: The charging of EVs will happen through a socket, installed in a garage, carport or even a parking space in the garden (slow charging), on company parking lots, public authorities (accelerated charging) or next to the road network (quick charging).

Read more
Mrs. Anne-St├ęphanie Renson

Towards an abolition/exemption of injection rate?
01/06/2010

On 26 April 2010, the federal Electricity regulator (“CREG”) published a study on the possible abolition or exemption of injection rate for production installations using renewable energy or qualitative combined heat and power (CHP).

Read more
Mrs. Anne-St├ęphanie Renson

Self-production, lease and solar panel
31/05/2010

On 22 March 2010, the Walloon energy regulator publishes new guidelines on self-production in relation with the lease of a solar panel-equipped building.

Read more
Mrs. Anne-St├ęphanie Renson

Difference between incineration plant and co-incineration plant
31/03/2010

Following an edict of the European Court of Justice, a power plant which uses, as an additional fuel (in substitution for fossil fuels used in the majority of its production activities), gas produced in a gas plant following thermal treatment of waste is to be regarded, jointly with that gas plant, as a ‘co-incineration plant’ when the gas in question has not been purified within the gas plant.

Read more
Mr. S├ębastien Engelen

Competition and Energy
31/03/2010

The European Commission accepts ENI commitments.

Read more

Click here to see the ad(s)

LexGO Network